Space / Satellites

Introduction

Due to the consolidation of operations, our client had a requirement for a new ISO 8 Cleanroom Facility and adjacent support areas for the manufacture and testing of specialist electronic components.

The Cleanroom suite was constructed on the ground floor of an existing building at their current site. The facility consisted of a large ISO8 Cleanroom, Technical Lab, Bonded Store, Change Lobby and Goods In / Breakdown Area.

Conditioned air is provided into a sealed ceiling void plenum from any two of three upflow air handling units which are located within the Cleanroom. A bespoke Trend control system manages the temperature and humidity of the cleanroom together with the run and standby control of the AHUs. The conditioned air is introduced from the plenum into the Cleanroom through ceiling mounted H14 HEPA filter fan units.

The installation also consisted of :-

  • Static dissipative flooring
  • Stand-alone Environmental Monitoring System
  • Oxygen Depletion Monitoring

Scope of Works

  • Project Management, including design & draughting
  • Wall & Ceiling, supply & build - Cleanroom Panel Construction
  • Raised access flooring modifications
  • Electrical Services Installation
  • Upflow Supply Air Handling Units - Run & Stand-by
  • Galvanised Supply Ductwork
  • HEPA Fan Filter Units
  • DX Services and Losnay heat recovery - Technical Lab
  • Cleanroom Doors and Interlocks
  • Cleanroom compatible lighting
  • Static Dissipative Vinyl Flooring
  • Oxygen Depletion Monitor
  • Fire Detection and Panic Alarm System
  • Specialist 'Rate Table' isolated concrete slabs
  • Bespoke Trend BMS system
  • Commissioning, Testing & Validation
  • Environmental Monitoring System - Particles, Pressures, Temperature & Humidity